Edie’s Place is a purpose-built not-for-profit facility that provides care with dignity and warmth. Balancing residential comfort with commercial compliance, the project offers a quiet, practical environment designed to support focused work and calm interaction.

The existing roof and superstructure were retained and integrated into the new build, requiring careful planning to meet acoustic and thermal performance targets. Recycled timber was used extensively throughout, bringing depth and texture while underscoring a commitment to sustainable construction.

Passive design strategies and acoustic separation contribute to comfort, privacy, and durability.

Type

Adaptive Re-use - Completed, not yet photographed

Architect

BVN

Engineer

M&G Consulting

Photography

TBC

Section A
01

02

03

04

05

06

07

08

09

10

11

12

13

Our Impact

Recycled Hardwood

Repurpose Structure

Connecting with Nature

Acoustically Insulated for Privacy

Our Process

Pre-Construction

1

Edie’s Place was brought to us by BVN with a clear intent: deliver a compliant commercial facility that felt like home. Arc. was engaged early under a Preliminary Agreement to help guide design resolution, construction methodology, and buildability. Our role included advising on the integration of retained structural elements, assessing sequencing impacts, and shaping a material reuse strategy that could be implemented on a live site.

Progressive preliminary pricing and detailing support
Development of Construction Management Plan and site logistics
Navigation of compliance requirements for use and change of class

Axom Axonometric drawing showing integration of new layout within the retained structure.

Design development render by BVN

Early Works

2

In an attempt to retain the buildings integrity, we carefully demolished the internal structure and finishes to completely strip it back to the bare bones.

Existing Envelope

Early days of demolition.

Complete strip out of existing building.

Structure

3

Structural Steel Integration

Huge structural members with impressive connections.

Enclosure

4

Recycled Hardwood Doors and Windows
Barestone Cladding
Rough-sawn Hardwood Rafters

Interiors

5

Mosaic Tile Setouts
Fully Customised Curved Library
Separated Office and Consult Rooms

Aftercare

6

Additonal repaints, tops ups of landscape materials, tile sealing, additional services and on demand maintenance calls.

Artwork Installation and Handling of Delicate Fittings
Specialised Timber Care
Routine Maintenance

Artwork installation.

Routine maintenance of the two exterior decks.